Modular buildings and kits

Meizong MIC

Modular buildings and kits
Meizong product manual, PDF 1—2; Modular Buildings PPTX

Selection checklist

For resorts, offices and shared facilities. Confirm whether delivery uses finished modules or disassembled kits: the transport plan differs fundamentally.

Request model, composition, drawings, fixing details, packing list, gross mass and use conditions. Documents must cover the exact selected product.

Transport packaging dimensions and gross mass are not confirmed in the supplied catalogue. Enter packing-list data in the planner; panel dimensions alone are insufficient.

Estimate shipment
45 seconds from the supplied video, without audio: workshop and modular assembly. Supplier material, not our inspection or verification of a shipment.

Supplier materials received 8 September 2026. These are enquiry directions, not stock availability or completed DINA projects. Check colours on samples. Confirm packaging, weight, prices and documents before ordering.

Suitability in Russia

Catalogue B1 ratings, formaldehyde claims and acoustic comparisons do not replace checks of documents required in Russia. For modules, separately confirm land, foundations, loads, fire requirements and utilities. Catalogue prices and lead times are not our offer.

Interior concepts