DINA BUILD

Commercial interiors

Materials and finishes suited to traffic, maintenance and the way the premises operate.

Reception and waiting area

Proposed scope

  • Functional brief
  • Finish schedule and requirements
  • Work sequencing
  • Material documentation review

The scope below is a starting point, not a binding offer. Availability, price and timing are confirmed before contract.

Commercial space follows the operating model

For a café, office or reception, describe the visitor journey and staff routines first. Where are visitors welcomed, where might queues form, and what must remain accessible to staff? Coordinate layout with equipment, cleaning and storage. Attractive materials still need to suit the actual operating and maintenance routine.

Record permitted renovation hours, neighbouring operations, delivery access and phased opening. Have specialists check technical and approval requirements for the intended use. Before ordering, review samples under actual lighting, replacement arrangements and maintenance stock.

How the project takes shape

01

Brief

Space, habits, constraints and expectations.

02

Samples and scope

Compare options and check compatibility.

03

Estimate and schedule

Record scope and exclusions before starting.

04

Work and acceptance

Inspection points and a list of outstanding issues.

AI-created stage illustrations, not a photographic record of one property.

Explore the work stage by stage →

What affects the price

Area and substrate condition, work complexity, materials, logistics and sequencing. The final amount follows an agreed scope, not a photograph alone.

Prepare a brief

Commercial interior ideas

Explore the Xingyi gallery →

Xingyi · archival visualisation

Office with a conversation area
Restaurant: timber and accent lighting
Intimate spa room

Compare design options →

Before your project

Good choices are in the details

Three things worth discussing before ordering.

01Agree before starting

Record the scope and exclusions. Agree changes together with their effect on timing and cost.

02Check at each stage

Set inspection points before concealed work is covered. Photographs help review progress but do not replace required documentation.

03Accept against agreed criteria

Agree acceptance criteria in advance. Record defects and correction deadlines in writing.

Interior concepts